Tuesday, 17 January 2012

Building of egypt pyramids

In many attempts to understand the secrets of the pyramids over the past hundred years, Egyptian researcher to reach a new interpretation supported by the evidence of how to build the egypt pyramids that was the idea that it was a primitive way, but discovery confirms that the ancient Egyptians reached a technological means they were able to lift these stones mechanically and without trouble.

Good researcher and explorer Mr. Ten said: "The configurations of the pyramid from the inside reveals that it was built from the inside and from outside as it is believed the idea of using the elevator, which is close to the lifts is designed factories and houses in the modern era, was careful engineers These pyramids on the establishment of corridors descent and the other one bullish and bearish inclination angle smooth, 28 seconds minutes and 53 seconds in terms of the descending passage to lead the process of mechanically uploaded to allow rise and fall of the elevator, a difference is necessary to neutralize the factor of gravity of the weight of rising in the case of two races of similar weight.




The researcher, who scored his point of view and interpretation of the patent that the corridors are located upward and downward in the direction of exactly one in the middle of the pyramid so that the descending passage down the aisle with Tlaekayama quite bullish at one point to serve the purpose mechanical, if we take into account the method of closure of the horizontal corridor which leads to the secret Queen's Room , and put the link up the ascending passage and lobby, we find that the most logical idea, and the ancient Egyptian engineer was keen to take on the ascending passage and lobby the greatest inclination angle of one.The well bottom of egypt pyramids
Researcher finds that moving the elevator was done through the well at the bottom of the pyramid, a nozzle or a slot containing the gear legs horizontally at the point of contact from the entrance to the lower chamber of the pyramid lead up to half a meter, and this difference is the horizontal radius of the gear motor of Lift It is here that another job of the well, which Egyptologists make a great effort to be interpreted as well to search for treasures while the researcher finds just the opposite, especially if we imagine a modified rope that extends from the descending passage crawler to the lower house and the well through the development of model orientation of this cord into the corridor linking Chamber of the well (bottom of the pyramid) and the descending passage to wrap around the horizontal gear Sakia the well operated by about four or six members.

Researcher prepared a wooden model is similar in the proportion with the percentages of building the Great Pyramid and prepared a videotape shows the modus operandi of the form which confirms that they are the same way in which the huge model of building the pyramid, and stresses his experience signs of sincerity Ptsawlh: Why take the ascending passage in the narrow The closer we come out from the beginning, although this can not come as no way be blocked by the three stones to the other side, but he's making the work of the brake body crawler with this corridor, so as not to fall into the descending passage.A starting point for further Commented Dr. Ali Barakat, geological and archeological researcher who followed the disclosure of the secrets of the egypt pyramids that this work and its interpretation represents a breakthrough to get to know other passages that enable priests to hide the rest of the pyramids, where we find the corridors without being depressed by the other emerging, based on the concept of the elevator the need for corridors and research in the corners mile corridor can identify pathways that concealed the priests filled way through the court did not draw attention, scholar, spent long hours in and around the Great Pyramid and toured with the intervention and exits and internal Hjrath hopes the installation and classification of stones and was able Baqraouath and his access to the corridors upward and downward and how to build them who have not reached the interpretation of a continued in his research on that idea and guided him to a full-time to its use of scientific explanations of the findings of his skis during the lifting of the ascending passage inside the pyramid and mechanically accurate and do not require a large number of manpower.

Mathematical equations
He adds that the researcher presented mathematical equations showing how to work Alosancir and durability Ohbalh used in the process of lifting and determine the manpower that was performing such a task in pulling the ropes that have been or crawler lift, citing the effects of fluid lubricant found to reduce the friction between crawler that moves up and down between the rocks Corridor promoted a smooth, perfectly smooth for ease of movement above and below the detection confirm that this ancient Egyptians knew the idea of the lift and work with mechanical and construction process was from the inside, not outside of the egypt pyramid.

He pointed out that the ascending passage length of 85 meters horizontal inclination 26.2 degrees and 30,2 m, up 38 lap sleek and landing begins to descend in the same corner of the corridor, and corridor 94 meters long, downward slope angle of 26.2 With the fall of 38,8 meters and go up and down by the crawler carrier balance weights and that there is a passage of up horizontally between the descending passage and the Chamber of the pit, and length of 29 feet where Bakrtan at the beginning of the corridor on the runway to change the direction of the rope descending passage to the room well, and there are Bakrtan Two more before the end of the corridor to reach the horizontal rope to the file, there is a room well and had a block column installation file, which logs, and there are mobile in the corridor crawler that moves upward to the top and bottom at an angle of 26.2 degrees and weights personnel carrier and a crawler moving in a descending passage that moves up and down, while the rollers are eight well-to-reel ninth column is the engine of the file Elevator.

No comments:

Post a Comment